The building was retrofit from a shipping warehouse into the current data center in an initial GMP in 2021. The design includes (4) 8MW Data Halls. There are (3) Reserve lineups and (22) Mechanical/Electrical lineups. The design utilizes external containers for the switchboards and UPS for both electrical lineups (servers, fan walls) and mechanical (chillers… Read More
This hyperscale data center campus is located in Northlake, IL, just outside of downtown Chicago. The campus covers 18.5 acres and will offer 520,000-sf of space once completely built. It is strategically located at the convergence of over 12 metro, longhaul and international networks. With direct access to existing power and municipal utility resources, the… Read More
This data center project consists of an 18 MW buildout of an existing core shell and is owner-furnished contractor-installed (OFCI). The facility’s design has a Bandwidth on Demand (BoD) of 6N/5 distributed redundancy. Verity offered project management services that included scheduling, quality control, preconstruction, construction, closeout, start-up and commissioning.
Verity performed project management services for the new 223,000-sf, 36-mw hyperscale data center shell and interior in the Chicagoland area. Verity managed the design, budget, permit process, and construction phases of the project.
The data center is conveniently located close to several major fiber providers, O’Hare International Airport, and the city of Chicago. It offers low-latency connectivity to many Midwestern regions. Verity performed data hall fit-out project management services for the14,000-sf, 2-mw tenant space.